Case Study : Wind Storm Repair

Loss Event: Hurricane Damage

Repair and replacement of roof.

Scope of project:

  • 70% damage reported throughout the roof
  • Full replacement of fasteners
  • Full installation of a .032-inch Aluminum standing seam roof system
  • Sealed the top side with a slow curing silicone
  • Roof panels were fabricated on site and hoisted to the roof with cranes
  • Doubled the amount of vertical supports and added 65% more purlins to give additional anchor points
  • Purchased over 65 camper trailers and leased enough land to set them all up for sustainable housing for the crew
  • Supplied a full-time chef to prepare 400 meals per day for the crew
  • Completion time: 3 months.

US Roofing Systems purchased over 65 camper trailers and leased enough land to set them all up for sustainable housing for the crew.

US Roofing Systems supplied a full-time chef to prepare 400 meals per day for the crew The entire project took 3 months to complete.