Case Study : Roof Repair & Replacement
Loss Event: Hurricane Damage
Repair and replacement of roof
Scope of project:
30% damage reported on the roof and large portion of sub-structure was destroyed
US Roofing Systems purchased over 65 camper trailers and leased enough land to set them all up for sustainable housing for the crew
US Roofing Systems supplied a full-time chef to prepare 400 meals per day for the crew
Full replacement of fasteners
Installation of a FiveV Crimp style steel roof
Installation of FT synthetics Platinum HT-SA high temp self-adhering roofing underlayment
Upon completion new roof had double the anchor points of original roof
Completion time: 3 months.